{{ 'fb_in_app_browser_popup.desc' | translate }} {{ 'fb_in_app_browser_popup.copy_link' | translate }}
{{ 'in_app_browser_popup.desc' | translate }}
Split-Type Air-Conditioner
Inverter Heat Pump
3/4 HP
Indoor Unit: 290 mm(H) x 799 mm(W) x 232 mm(D)
Outdoor Unit: 420 mm(H) x 730 mm(W) x 310 mm(D)
R32
Grade 1 Energy Label
Not enough stock.
Your item was not added to your cart.
Not enough stock.
Please adjust your quantity.
{{'products.quick_cart.out_of_number_hint'| translate}}
{{'product.preorder_limit.hint'| translate}}
Limit {{ product.max_order_quantity }} per order.
Only {{ quantityOfStock }} item(s) left.
Dual Barrier Coating
Easy Clean
Anti-mold filter (Air filter)
Microparticle Catching Filter (Optional)
Electrostatic Anti-allergy Enzyme Filter (Optional)
Computerized Dehumidification
Inverter Control
I FEEL Control
Sleep Mode
Noise-Reducing Design
Vertical Swing (Auto)
Horizontal Swing (Manual Selection)
24 Hour Pre-set On/Off
Remote Controller with LED Backlight
Remote Controller Luminous button
Error code on remote controller
Electric Circuit Protection
Auto Re-Start^
Self Diagnosis
CN 104 & CN 105 Wi-Fi connection terminal#
Anti-Corrosion Blue Fin (Outdoor Unit)
Model Indoor Unit MSZ-GS07VF
Outdoor Unit MUZ-GS07VF
Cooling / Heating Capacity Rated kW 2.20/2.30
BTU/h 7,506/7,848
Min-Max kW 0.79-2.50/0.55-2.60
BTU/h 2,695-8,530/1,877-8,871
Power Consumption Rated kW 0.69/0.59
Min-Max 0.17-0.91/0.15-0.71
Operating Current A 3.2/3.0
Air Circulation m³/min. 8.4/8.4
C.O.P. 3.19/3.90
Dehumidifying Capacity I/h 0.58
Noise Level Indoor Unit (Si)/Lo-Hi dB(A) 21-38
Outdoor Unit 49
Dimension (H x W x D) Indoor Unit mm 290x799x232
Outdoor Unit 420x730x310
Weight Indoor Unit kg 9
Outdoor Unit 23
Refrigerant Pipe Diameter Liquid / Gas mm φ6.35/φ9.52
Max. Piping Dimension Height Difference / Length m 20
Voltage V 220
Phase / Frequency Single / 50 Hz
Refrigerant R32
Energy Efficiency Grade 1
Remarks
The product specifications are provided by factories of Mitsubishi Electric.
Before purchase and installation, the space and position needed for installation should be confirmed by qualified engineers.